Hutton Ranch Road Dirt Stabilization Project

What's New...

02 February 2024: Design for the Hutton Ranch Road Dirt Stabilization Project is nearing completion. 

Project Overview

Slated for construction in Spring 2024,the Hutton Ranch Rd Dirt Stabilization Project includes super-elevating horizontal curves, grading the road to a typical section, and stabilizing the dirt driving surface between Townsend Winona Rd & O’Neil Lane (approximately 1.1 miles) with a lignin-based stabilizer. 

  • Status: 90% Design
  • Project Engineer: Coconino County
  • Estimated Construction Start: Spring 2024
  • Estimated Construction Completion: Spring 2024
  • Project Cost: TBD
  • Project Contractor: TBD